Days 5-8, 2002-08-17 (Sat) to 20 (Tue) - Plastering & Screeding


On days 5 to 8, the builder returns to fininsh of the plastering, and screeds the flooring

He only rests on Sunday!!

1273 Sockets, Skirting & Extractor fitting on Cooker Wall.jpg
1273 Sockets, Skirting & Extractor fitting on Cooker Wall.jpg
45.56 KB
1275 Sockets & Plastering, Fridge Wall.jpg
1275 Sockets & Plastering, Fridge Wall.jpg
44.40 KB
1276 Plastered Soil-pipe boxing & Archway.jpg
1276 Plastered Soil-pipe boxing & Archway.jpg
46.22 KB
1277 Plastered CH Boxing in Utility.jpg
1277 Plastered CH Boxing in Utility.jpg
26.30 KB
1278 Plastered CH Boxing in Utility.jpg
1278 Plastered CH Boxing in Utility.jpg
57.04 KB
1279 Plastered Archway in Utility.jpg
1279 Plastered Archway in Utility.jpg
43.23 KB
1280 Screeded Floor.jpg
1280 Screeded Floor.jpg
41.01 KB
1281 Ceiling Lights.jpg
1281 Ceiling Lights.jpg
29.02 KB
1282 Ceiling lights, again.jpg
1282 Ceiling lights, again.jpg
32.03 KB

These images are around a 3rd the dimensions & only the 10% file size of the originals.

If any family or friends want the file or printed copies of the originals, please do not hestate to contact us.


All Images Copyright © 2002, Sean & Siobhan Pearce.

Last updated 22/08/2002


Created by IrfanView