Day 3, 2002-08-15 (Thu) - Making Good, Boxing in etc


The third day, the builder returns to start making good the walls, floor & ceiling.

The cahnnels are filled, extractor ducting is fitted, a new ceiling goes up, the soil-pipe is boxed in, and some central heating pipes in the Utility area are boxed in.

The old square entrance between the Kitchen and Utility area is narrowed, and an archway formed.


1238 Sink Wall & Soil-pipe Boxing.jpg
1238 Sink Wall & Soil-pipe Boxing.jpg
55.60 KB
1240 Utility side wall.jpg
1240 Utility side wall.jpg
70.86 KB
1241 Utility Archway & Fridge area.jpg
1241 Utility Archway & Fridge area.jpg
69.31 KB
1242 Fridge wall.jpg
1242 Fridge wall.jpg
47.37 KB
1243 Cooker Side wall made good.jpg
1243 Cooker Side wall made good.jpg
53.30 KB
1244 Ceiling Plasterboard.jpg
1244 Ceiling Plasterboard.jpg
24.42 KB
1245 Boxing CH Pipepwork.jpg
1245 Boxing CH Pipepwork.jpg
27.93 KB
1247 Boxing CH Pipework.jpg
1247 Boxing CH Pipework.jpg
72.03 KB
1248 Extractor Ducting.jpg
1248 Extractor Ducting.jpg
52.03 KB
1250 Archway to Utility.jpg
1250 Archway to Utility.jpg
55.89 KB
1251 Extractor Outlet.jpg
1251 Extractor Outlet.jpg
101.51 KB

These images are around a 3rd the dimensions & only the 10% file size of the originals.

If any family or friends want the file or printed copies of the originals, please do not hestate to contact us.


All Images Copyright © 2002, Sean & Siobhan Pearce.

Last updated 22/08/2002


Created by IrfanView